ESM Power Ltd have been appointed by Brookgate Ltd for a major project at CB4 Cambridge North.
ESM Power were chosen as principal contractor to design, project manage and deliver the 11kV Infrastructure and LV metered connections to the Television Centre, Wood Lane, West London.
ESM Power were chosen as the main contractor to connect a 27MW solar farm to the grid.
ESM Power energise the 132kV site at Troughton Solar Farm.
ESM Power were chosen as the main ICP contractor for a new 33/11kV Primary Substation to support Sherford Town development.
ESM Power were chosen as principal contractor to deliver the high voltage infrastructure connection to West Raynham Solar Farm.
At the Cody Park Data Campus in Farnborough ESM Power’s client was looking to upgrade and improve resilience to the existing High Voltage network.
ESM Power Ltd were contracted by the client to design, engineer, procure and construct a new 33kV/11kV primary substation.